M I C H A E L C A R R
A R C H I T E C T
1/7
ACCOLADE, BERRI SA
This project was an expansion from two adjacent sites. The facility included a bottling process line which needed to be acoustically separated from adjacent rooms including tasting rooms, offices, storage and distribution areas.
Within these spaces certain materials were specified to ensure safety measures were met and complied with to Australian Standards to processing areas and tasting rooms. Wash down areas were provided to the external of the building also.
Built by H.Troon Construction
WHAT
Wine Production and Distribution Facility
WHERE
Berri, SA
WHEN
Completed 2019